Decoration knowledge decoration roughcast room wat

2022-07-22
  • Detail

Rough houses are also known as "initial decoration houses". Most of these houses have only door frames but no doors, and the walls and floors are only treated for foundation rather than surface treatment. All exterior finishes outside the house, including those of balcony and rain cover, should be completed according to the design documents. Many people are also concerned about the installation of water and electricity and the decoration steps of the blank house. For friends who decorate for the first time, it is still necessary to have a simple understanding of the decoration steps of the blank house before doing the house decoration work. If you want to have a good idea of the decoration of your new house, you must have a certain understanding of the decoration of rough houses. Now let's popularize the knowledge of water and electricity installation of roughcast houses

blank room is also called “ Newly decorated house ”, Most of such houses have only door frames and no doors, and the walls and floors are only treated for foundation without surface treatment. All exterior finishes outside the house, including those of balcony and rain cover, should be completed according to the design documents. Many people are also concerned about the installation of water and electricity and the decoration steps of the blank house. For friends who decorate for the first time, it is still necessary to have a simple understanding of the decoration steps of the blank house before doing the house decoration work. If you want to have a good idea of the decoration of your new house, you must have a certain understanding of the decoration of rough houses. Now let's popularize the knowledge of water and electricity installation of roughcast houses

rough room decoration process

first, clarify the decoration area and understand the wall size

1. Specify the area involved in the decoration process. Especially the tiling area, wall paint area, wallpaper area and floor area

2. Define the main wall dimensions. Especially in the future, we need to design the wall size of furniture

second, reasonable demolition and modification, and smart use of space

mainly includes wall demolition, wall building, wall peeling, heating, plastic steel window replacement, etc. The demolished and modified garbage should be cleaned out in time to ensure indoor cleanliness, which is also for the convenience of construction. Water and electricity transformation, arrange the use of each space, and try not to regret. Once the wall and ceiling are sealed, it is difficult to add sockets. Therefore, we must determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc

before the water and electricity transformation, the cabinet designer should come to the door for the first measurement to help you determine the transformation plan of power supply and waterway. For the water heater, you'd better send someone to design the location of the power supply and interface according to the model you determine

note: on the wall below the basin, it is best to leave a power socket for the convenience of installing kitchen treasures. The air conditioning hole and power supply should be placed on the wall at the head of the bed as far as possible to avoid the air conditioning blowing directly at people in the future. Strong electricity and weak points should be kept at a distance of 20 cm. For example, a distance of 20 cm should be left between the socket and the network cable

third, optimize the appearance of the pipeline and strengthen the decorative effect

in general, the bathroom is installed the most. Bathroom decoration is the most troublesome part of our whole home decoration. It should not only prevent slip, but also ensure dryness. Therefore, optimizing the appearance of the pipeline can not only prevent moisture, but also achieve the effect of decoration

IV. substantial decoration of the ground (key points of tiles)

floor decoration (key points of tiles). Before tiling, buy floor drains. After waterproof and roughening, prepare to stick bricks. In addition to the normal tiling attention, the tiles should be soaked in water and dried in the shade; Apart from the broken tiles left for cutting, I personally emphasize the overall beauty of tiling

v. beautify the walls of the blank room and make the walls beautiful

wallpaper is much better than painting. After the wall paint is brushed, the oil union brushes nitrocellulose paint at the place where the wallpaper needs to be pasted. The paint can dry out the next day, and then you can ask the master to paste the wallpaper. At first, we were worried that pasting wallpaper would make the painted white wall dirty. Later, when we posted it, we learned that pasting wallpaper was really a very clean job! Note: do not open the window for ventilation within 48 hours after the wallpaper is pasted, and let it dry slowly in the shade. Tell the master that if there is warping in some places, please ask him to help repair it

VI. skillful arrangement of socket installation

the socket panel can be installed in about half a day. Help to repair

precautions for water and electricity installation of roughcast room

1. During the construction process, try to reduce unnecessary joints of the pipe body in the wall, and there is no way to connect the faucet, toilet and basin outside. Wrap the screw teeth of all pipeline connection joints with hemp wire and white paint, tighten them, and distribute them in place horizontally and vertically. In case of crossing of ground pipelines, the secondary pipeline must be installed under the main pipeline to keep the overall water pipe distribution at a horizontal line

2. Precautions for the decoration of the blank room. All water connections must be installed with downcomers and floor drains, and the PVC pipes must be coated with special PVC glue when connecting. Note that when the horizontal drop is connected to the main downpipe embedded in the original roughcast room, it should be kept static for 6 hours

3. Precautions for the decoration of the blank room. After the pipes are distributed in place, the pipes must be clamped at the turning or at the place with a stand faucet to prevent loosening. Special pipe clamps are required for fixing water pipes

4. The aluminum plastic pipe or PPR pipe used must be qualified products that have been inspected and delivered. Different colors should be used for cold and hot water pipes

5. Use light and rigid keel as much as possible for the water pipe, and the cement board tiling is the most prone to problems, so pay attention to soaking the tiles in place, and choose high-quality cement

6. Precautions for the decoration of the blank room. The kitchen should be hygienic, and the slots should be waterproof

7. If the main sewer embedded in the original roughcast room is not enough or ideal, and it is not in place, the sewer can also be re opened on the floor according to the actual situation, and the surrounding of the pipe can be sealed with mortar with fire-proof glue again. The newly sealed place is surrounded by a 10mm high circle with cement mortar. After 48 hours of solidification, fill the circle with water, and penetrate downstairs after 24 hours to see if there is water seepage around the newly installed sewer

editor's summary: the above information is about the water and electricity installation knowledge of the decoration blank room, which is for reference only, and I hope it will be helpful to you. If you want to know more about it, you can pay attention to the information